CS PPM Power Suite - Fast benefits through Starter Kit approach

The Starter Kit for the CS PPM Power Suite is the fast way to implement a flexible PPM solution based on the Power Platform Technology. You benefit from a fast deployment with low implementation effort. 

Our approach

We accompany companies from the design and conception phase, through the implementation phase to the launch and go-live of the solution. 

Design & Concept

During a kick-off meeting we jointly define the goals, requirements and scope of your PM tool introduction. A design workshop can then be conducted with these goals. In this workshop, we present the features of the CS PPM Power Suite in detail and you define the adjustments. This means that the technical system design is ready within one week. 

Implementation

In the implementation phase, our best practice approaches and your individual system requirements are implemented. In order to validate the system and the customizations, your Power Suite will be introduced in a small core team of maximum 10 people. In addition to this test phase, the technical documentation and release are prepared in parallel.

Introduction & Go-Live

To guarantee a successful handover after implementation, training, guidelines and other training materials are made available to the project, program and portfolio managers. At the same time, administrators receive an introduction to the system. An intensive support phase in the form of go-live support, data migration or user training concludes the introduction of the Power Suite.

Project & Quality Management

We ensure quality and transparency throughout the entire project by means of regular status reports, quality assurance measures and acceptance protocols. A compact project charter and a project plan provide control over the entire planning.

  • Design & Concept
  • Implementation
  • Introduction & Go-Live
  • Project & Quality Management

The advantages at a glance

  • Short design and introduction phase 
    Planning, design, implementation, system release and go-live all take place within a few weeks, so that a usable production system is quickly available. So project managers can get started right away.   
  • Sophisticated Power Apps configuration 
    Predefined modules within the Power Platform for project, program and portfolio management are based on best practices from several hundred PPM tool implementations and 25 years of experience. Of course, this basic configuration can be adapted to your specific needs in the course of the Starter Kit project within a very short time. 
  • Usability and Design
    A user-friendly layout in all areas of the system enables efficient project management and user orientation. By inserting your corporate identity (logo, colour scheme, etc.), an emotional image world and further individual design adjustments, users feel immediately at ease. This increases acceptance and usage. The Power Suite can thus be used directly and offers effective planning options right from the start.

You want to know more?

Just get in contact with us! We look forward to your message.

Your personal contact

Ruth Subjetzki

Ruth Subjetzki

Project Inquiries & Account Management

* Mandatory fields